Renovate Restrooms - Cleveland Air Traffic Control Center

The project was executed in three phases. In Phase 1, Bancroft was tasked to correct existing plumbing system deficiencies, code corrections and provide maintenance access to the current system.  The domestic cold water and hot water systems were designed and refurbished with  type ‘L’ copper piping and fittings above grade with all  required accessories and insulation. New fire alarm devices were provided with manual pull stations, photoelectric smoke detectors, flow and tamper switches. All new audio/visual devices adhere to meet NFPA Code and Ohio Accessibility Code requirements.

Phase 2 included the refurbishment of the Control Wing first floor toilet rooms which included tie in to existing utility system, new toilet stall partitions, new flush valves, new sinks, new vanity counters, new mirrors, repair of existing wall tiles and relocating existing wall mounted accessories.  The men’s toilet room is 408SF, which includes three existing showers; one handicap and two non-handicap single stall showers. The women’s toilet room is 216SF and adjacent to the toilet rooms is a lounge of about 302SF.

Phase 3 of the project was to design and refurbish four restrooms on the administration wing– two on the first floor and two on the second floor. The second floor Women’s toilet also included a lounge space. The first floor men’s toilet is 112 square feet. The women’s toilet on the first floor is 78 square feet, with an additional 130 square feet of lounge space. The second floor men’s’ toilet is 112 square feet and the second floor women’s toilet is 98 square feet and does not have a lounge associated with it.

During Phase 3, work was done to remove the entire existing gyp board ceilings to have access to remove the existing asbestos. The existing glazed wall blocks were retiled with new tile.

 

 

 

 

 

Client

FFA - Cleveland Air Route Traffic Control Center

Location

Cleveland, OH

Size

12,400 SF

Dates

Construction - 2015

Bancroft Services

Architecture, MEP Engineering, Construction Admin

Subconsultants

Knight Engineering - Civil Engineering, Structural Engineering

General Contractor

Lawdensky Construction Company