Bancroft was contracted to provide Architectural and Engineering design services at the Rush University Medical Center to develop Schematic design, design development and Construction Documents for replacing existing angiography equipment with new Siemens bi-plane angiography machine.
The project was for replacing existing angiography equipment with new Siemens bi-plane angiography machine. The main project goal is to replace the existing equipment in the Tower Building, 4th floor, Room 8. The new equipment is also provided by Siemens and will utilize the matching ISO centers of the existing equipment.
Client
Rush University Medical Center
Location
Crestwood, IL
Size
1,200 SF
Cost
$94,034
Dates
Design - 2020
Constructed 2021
Bancroft Services
Project Management, Architecture, MEP Engineering
General Contractor
Bully & Andrews