Upgrade Mechanical Systems / Renovate Interior

The Crestwood Armory (VT003) is a 216,283 square foot, two-story building constructed in 1981. The scope of work provides for replacing and upgrading the building HVAC system and controls, repairing plumbing and fire protection system, painting and sealing outside surfaces of exterior walls, replacing or resealing windows, tuckpointing, selectively replacing ceramic tile floors, replacing stair tread finishes, painting and, replacing the kitchen ceiling. The scope also provides for the abatement of asbestos containing materials.

Client

Capital Development Board Crestwood Armory

Location

Crestwood, IL

Size

22,000 SF

Cost

$2,000,000

Dates

Design - 2017

Bancroft Services

Project Management, Architecture, MEP Engineering

Prime Firm

Frega Associates, Ltd.

Previous
Previous

Replace Bi-Plane

Next
Next

Construct New Energy Center